Government Meetings

Agendas, minutes, and meeting recaps for Middlesex County municipalities

Recap Available

South Amboy Mayor & Council — Jun 17, 2026

Wednesday, June 17, 2026

About this meeting

South Amboy Mayor & Council in South Amboy met on Wednesday, June 17, 2026. County Brief published an AI-labeled recap below, drawn from the official packet. Use the original documents or the official site for the full record, and browse other South Amboy Mayor & Council meetings from South Amboy.

Meeting Recap AI-generated summary

Original minutes (PDF) on southamboynj.gov ↗Original agenda (PDF) on southamboynj.gov ↗

County Brief is an independent local news service from Wisdom Digital Media, Inc. It is not affiliated with, endorsed by, or acting on behalf of any government agency. Meeting agendas and minutes come from each town's or school district's official website; every meeting links to the original document. Official sources

On June 17, 2026, the South Amboy City Council convened to address various agenda items. The meeting commenced with a roll call and the approval of several resolutions in a single motion, including Resolution No. 26-135, which reallocates unexpended funds from the Community Development Block Grant (CDBG) program for the construction of ADA access ramps. Other notable resolutions included authorizing a veteran tax exemption for Riley Robinson, emergency sanitary sewer repairs at multiple locations, and the renewal of liquor licenses for the upcoming year. Additionally, the Council adopted Ordinance 2026-10, which adds a new chapter to the municipal code regarding lead-based paint inspections, and Ordinance 2026-09, which provides for various capital improvements funded by a bond issuance. The meeting concluded with the approval of the bill list dated June 11, 2026, and the release of minutes from the previous meeting.

How this recap was made

Written by AI on Oct 8, 2026 from the official minutes linked on this page, then checked by software, not by a reporter. It describes what the minutes record. This is not an official record; the linked document is. More on how County Brief works

Report an error

Get South Amboy meeting agendas and recaps by email

Free. One email when a new agenda or recap for South Amboy is posted, so you know what is being decided before and after each meeting.

Up to 3 words. You also get the free weekly Middlesex County email. Unsubscribe anytime. Privacy

Items in the posted packet

Taken from the official agenda index. This is a list of attachments, not a recap of votes.

  1. OPENING PRAYER AND SALUTE TO THE FLAG 35 ROLL CALL: CONRAD. , DATO. , LENAHAN , REILLY , GROSS
  2. Called in a mark out request to New Jersey Underground Location Company as required by law
  3. Prepared a road closure plan and letters to residents and had them approved by Officer Garcia from the Traffic Department
  4. Posted No Parking signs on both sides of street in our work area prior to the start of construction
  5. Supplied (2) South Amboy Police officers for traffic for 6 working days, up to 8 hours each per day
  6. Supplied all necessary signs, cones and barricades to perform the road closure as was discussed with Officer Garcia
  7. Mobilized all equipment to the site
  8. Cut, removed and disposed of the pavement in the area of the sinking manhole
  9. Excavated around the manhole
  10. Installed trench shoring as per OSHA regulations
  11. Excavated approximately 11.5 feet deep to the invert of the pipe
  12. Removed and disposed of the manhole
  13. Excavated and exposed the 15-inch clay pipe on each side of the manhole,
  14. Excavated 20 inches below the invert elevation of the 15-inch clay pipe
  15. Supplied and installed 3/4" clean stone 12 inches thick to support the new manhole. ge B & W Construction Co. of NJ Inc. P.O. Box 574 Phone 732-967-1900 South River, NJ 08882 Fax 732-967-6330 Page 2 of 2
  16. Supplied and installed a 6'x6'x8" thick concrete slab
  17. Exposed the ends of the 15-inch clay pipe in each side of the manhole
  18. Supplied 11 LF of 15-inch schedule 35 PVC pipe across the concrete slab
  19. Connected the 15-inch PVC pipe to the existing 15-inch clay pipe using fernco couplings
  20. Poured concrete inside the manhole */4's of the way up the 15-inch PVC pipe
  21. Removed the 2-inch electric pump, suck tube and generator used for dewatering the excavation
  22. Installed the remaining sections of the manhole including the 3 feet cone
  23. Removed the 4-inch sewer bypass
  24. Supplied and installed a manhole frame and cover to grade using blocks, bricks and cement
  25. Backfilled around the manhole to the top of the 15-inch PVC pipe using 3/4" clean stone
  26. Removed all trench protection
  27. Entered the manhole and cut the top section out of the 15-inch PVC pipe to create and invert
  28. Backfilled the remainder of the trench 8 inches below finished pavement elevation using 3/4" blend stone compacting in lifts to prevent settlement
  29. Supplied and installed stabilized base course asphalt 6 inches thick
  30. Supplied and installed FABC top course asphalt 2 inches thick with tack
  31. Disposed of all excavated materials off-site
  32. Removed all equipment off site
  33. Cleaned up the work area
  34. Call ina mark out request to New Jersey Underground Location Company as required by law
  35. Prepare a road closure plan and letters to residents and have them approved by Officer Garcia from the Traffic Department
  36. Post No Parking signs on both sides of street in our work area prior to the start of construction
  37. Supply (2) South Amboy Police officers for traffic for 6 working days, up to 8 hours each per day
  38. Supply all necessary signs, cones and barricades to perform the road closure as was discussed with Officer Garcia,
  39. Mobilize all equipment to the site
  40. Cut, remove and dispose of the pavement in the area of the sinking manhole. 10, Excavate around the manhole
  41. Install trench shoring as per OSHA regulations
  42. Excavate approximately 11.5 feet deep to the invert of the pipe
  43. Remove and dispose of the manhole
  44. Excavate and expose the 14-inch clay pipe on each side of the manhole
  45. Excavate 20 inches below the invert elevation of the 14-inch clay pipe
  46. Supply and install 34” clean stone 12 inches thick to support the new manhole
  47. Supply and install a 6’x6’x8” thick concrete slab
  48. Expose the ends of the 14-inch clay pipe in each side of the manhole
  49. Supply up to 10 LF of 14-inch schedule 40 PVC pipe across the concrete slab
  50. Connect the 14-inch PVC pipe to the existing 14-inch clay pipe using fernco couplings or gripper adapters
  51. Cut openings in the manhole riser section so that the riser can be installed over the 14-inch PVC pipe
  52. Fill the openings between the 14-inch PVC pipe and the manhole riser using bricks and cement. 24, Pour concrete around the outside of the manhole so that it is sealed to the concrete slab
  53. Pour concrete inside the manhole 34's of the way up the 14-inch PVC pipe,
  54. Remove the 2-inch electric pump, suck tube and generator used for dewatering the excavation
  55. Install the remaining sections of the manhole including the 3 feet cone
  56. Remove the 4-inch sewer bypass
  57. Supply and install a manhole frame and cover to grade using blocks, bricks and cement
  58. Backfill around the manhole to the top of the 14-inch PVC pipe using 4” clean stone
  59. Remove ali trench protection
  60. Enter the manhole and cut the top section out of the 14-inch PVC pipe
  61. Backfill the remainder of the trench 8 inches below finished pavement elevation using %” blend stone compacting in lifts to prevent settlement. 34, Supply and install stabilized base course asphalt 6 inches thick
  62. Supply and install FABC top course asphalt 2 inches thick with tack
  63. Dispose of all excavated materials off-site
  64. Remove all equipment off site,
  65. Clean up the work area