News
Route 23 in Hardyston to drop to one lane for six months starting mid-December
The Route 23 bridge over the railroad at Beaver Lake Road needs repairs, and temporary traffic lights will send traffic through one direction at a time.
Route 23 in Hardyston will narrow to a single lane at Beaver Lake Road for about six months starting in mid-December, Deputy Mayor Tony Alfano told residents this week.
"Unfortunately, that bridge needs to be repaired and now," Alfano said in a video he posted on Nextdoor from the intersection, speaking about the Route 23 bridge over the New York, Susquehanna and Western railroad tracks, where a sign posts a 10-ton weight limit. "The DOT is telling us that in two weeks, middle of December, for six months, this bridge will be a one-lane highway."
Alfano warned of "congestion in both directions throughout the day," with Route 15 still not fully open and adding to the traffic coming through. "I'm asking you all to be very patient throughout the holiday season and beyond," he said. "Keep in mind that this is only temporary."
How traffic will move
Alfano also shared the New Jersey Department of Transportation's traffic control plan for the job (Route 23 over the NYSW Railroad, Contract No. 06926.17). Under the plan, portable traffic signals will run two-way traffic through one open lane. Northbound Route 23, southbound Route 23 and Beaver Lake Road each get their own green light in turn, on a cycle of about two and a half minutes (150 seconds) at all hours, weekday rush hours included.
The plan also calls for:
- Emergency vehicle pre-emption on the Route 23 approaches, with the contractor giving local fire, rescue and police the in-vehicle transmitters that change the lights.
- Daily checks of the signals, and flaggers to direct traffic by hand if they fail. If the system fails, every light shows solid red.
- Flashing yellow on Route 23 and flashing red on Beaver Lake Road at times when both lanes are open.
Neighbors worry about the timing
The post drew more than 20 reactions and a dozen comments. "They shouldn't do it now," one Crystal Springs resident wrote, pointing to the holidays and the Route 15 work. Alfano replied that he had spoken with the Route 15 project engineer, who "will recommend that NJDOT wait for RT 15 to be completed before closing RT 23," so the mid-December start could still move.
Other neighbors questioned whether repairs are enough for a bridge they say has been deteriorating for years, and one said overweight dump trucks still cross it.
NJDOT has not yet announced a start date. County Brief will update this story when the schedule is confirmed.