Government Meetings

Agendas, minutes, and meeting recaps for Bucks County municipalities

Recap Available

Solebury Township Board of Supervisors — Jun 16, 2026

Tuesday, June 16, 2026

About this meeting

Solebury Township Board of Supervisors in Solebury met on Tuesday, June 16, 2026. County Brief published an AI-labeled recap below, drawn from the official packet. Use the original documents or the official site for the full record, and browse other Solebury Township Board of Supervisors meetings from Solebury.

Meeting Recap AI-generated summary

Original minutes (PDF) on soleburytwp.org ↗

County Brief is an independent local news service from Wisdom Digital Media, Inc. It is not affiliated with, endorsed by, or acting on behalf of any government agency. Meeting agendas and minutes come from each town's or school district's official website; every meeting links to the original document. Official sources

The Board of Supervisors met on June 16, 2026, and unanimously approved bills payable and minutes from three prior meetings. It accepted the immediate resignations of Hope Blaythorne from the Environmental Advisory Council and Mike Kerins from the Parks & Recreation Board, and appointed members and liaisons to the Lake Solebury Committee for terms expiring June 16, 2027. Following a public hearing, the Board authorized a Certificate of Appropriateness for a house sign at 6325 Fleecydale Road. It adopted the Deer Fence Ordinance and the Warehouse and Logistics Ordinance, which addressed zoning rules for warehousing, distribution, truck parking, data centers and sound levels.

After hearing a traffic engineer’s presentation and resident comments on Lower Mountain Road, the Board authorized administration to repeal the traffic restriction ordinance and install permanent post-mounted radar equipment in both directions. It also preserved the option to approve a future traffic study. The Board authorized bidding for the 2026 Road Program and a fall public forum on gasoline-powered landscaping equipment. Other actions included approving a contract for franchise negotiations and granting an employee leave of absence through July 12, 2026. A presentation updated the Board on the Hal H. Clark Park boat launch project. The meeting adjourned at 7:31 p.m.

Decided

  • Lower Mountain Road traffic controls Approved, unanimousFrom the document: “it was unanimously agreed to authorize the Township Administration to repeal the Lower Mountain Road Traffic Restriction Ordinance”
  • Warehouse and Logistics Ordinance Approved, unanimousFrom the document: “it was unanimously agreed to adopt the Warehouse and Logistics Ordinance No. 2026-003”
  • Deer Fence Ordinance Approved, unanimousFrom the document: “it was unanimously agreed to adopt the Deer Fence Ordinance No. 2026-002”
  • Certificate of Appropriateness for 6325 Fleecydale Road Approved, unanimousFrom the document: “it was unanimously agreed to authorize the Certificate of Appropriateness to TMP No. 41-002-020-001”
  • Lake Solebury Committee appointments Approved, unanimousFrom the document: “it was unanimously agreed to appoint the following, without compensation, to the Lake Solebury Committee”
  • Lower Mountain Road future traffic study option Approved, unanimousFrom the document: “it was unanimously agreed for the Board to have the option for approving a traffic study to be performed at a future time”
  • 2026 Road Program bid advertisement Approved, unanimousFrom the document: “it was unanimously agreed to authorize the Township Engineer and Administration to advertise the bid specifications for the 2026 Road Program”
  • Gasoline-powered landscaping equipment public forum Approved, unanimousFrom the document: “it was unanimously agreed to authorize the Environmental Advisory Council to hold a Public Forum in Fall 2026”
  • Cohen Law Group franchise negotiations agreement Approved, unanimousFrom the document: “it was unanimously agreed to approve the Township Administration to execute the agreement with Cohen Law Group”
  • Employee leave of absence Approved, unanimousFrom the document: “it was unanimously agreed to approve the request of employee number 135 and grant a leave of absence (LOA) through July 12, 2026”

Discussed, no vote recorded

  • Hal H. Clark Park boat launch project update
  • Lower Mountain Road traffic study, enforcement, and resident concerns
  • Carversville Day and local orchard crop losses
  • North Wales Water Authority request
  • Historical Architectural Review Board recommendation on the Fleecydale Road sign

Coming up

  • Public forum on gasoline-powered landscaping equipment (Fall 2026)
  • Employee leave of absence ends (July 12, 2026)
How this recap was made

Written by AI on Nov 22, 2026 from the official minutes linked on this page, then checked by software, not by a reporter. An item is listed under Decided only when the minutes' own wording shows the action, and that wording is quoted. A vote count appears only when the minutes give it. Everything else is listed as discussed. This is not an official record; the linked document is. More on how County Brief works

Report an error

Get Solebury meeting agendas and recaps by email

Free. One email when a new agenda or recap for Solebury is posted, so you know what is being decided before and after each meeting.

Up to 3 words. You also get the free weekly Bucks County email. Unsubscribe anytime. Privacy

Items in the posted packet

Taken from the official agenda index. This is a list of attachments, not a recap of votes.

  1. Teir 1. Based on the Eiiergy Use Analysis and Solar Feasibility Study required per §27-2601.1.VV.(11), the building may be increased by 15,000 square feet if 70-80% of peak energy demand is met by on-site solar power
  2. Teir 2. Based on tlie Energy Use Analysis and Solar Feasibility Study reqriired per §27-2601.1.VV.(11), the building may be increased by 25,000 square feet if 81-90% of peak energy demand is met by on-site solar power
  3. The berm shall have a maximum side slope of three (3) feet horizontal to one (l) foot veitical
  4. The berm shall be covered by a well-maintained all season natural groundcover
  5. Ingress and egress to and froi'n the site with a study of turning movements of different sized vehicles
  6. Interior and exterior-facing signs, including signs directed at all dock and delivery areas, identifying idling restrictions and contact information to report violations, shall be posted
  7. All signs under this section shall be reflective, legible, durable, and weatlier-proof
  8. the anticipated power usage, including the amount of power expected to be used on average and at times of peak usage;
  9. the proposed supply sources, including the proposed amount of power expected to be generated by on-site renewable energy and energy storage capacity (if applicable);
  10. documentation from the applicable electric service provider certifying that the necessary capacity is available and that electric service provider will service the Warehouse/Distribution Facility; and
  11. creation of, or improvements to, public park and recreation facilities;
  12. first responder equipment and training;
  13. protection or preservation of natural resources (including, but not limited to, farmland, woodlands and waterways);
  14. stream bank restoration;
  15. public infrastructure improvements or restoration thereof; and
  16. Teir 1. Based 011 the Energy Use Analysis and Solar Feasibility Study required per §27-2601.1.WW.(15), the building may be increased by 15,000 square feet if 40-50% of peak energy demand is met by on-site solar power
  17. Teir 2. Based on the Energy Use Analysis and Solar Feasibility Study required per §27-2601. 1.WW.(15), the building may be increased by 25,000 square feet if 51-60% of peak energy demand is met by on-site solar power
  18. Signs sha]l be ii'istalled at all truck exit driveways directing truck drivers to the truck route as indicated in the ttuck routing plan
  19. All signs under this section shall be reflective, legible, durable, and weather-proof
  20. Low-Frequency Noise (dBC Weighting). i) dBC Cap: To mitigate ground-borne "thrum" and low- frequency vibration not captured by A-weighting, the sound level shall not exceed 65 dBC at any residential property line
  21. Mandatory Tier 4: All backup generators must ritilize EPA Tier 4 Fina) engines with integrated Selective Catalytic Reduction (SCR) and Diesel Particulate Filters (DPF) to eliminate soot and nitrogen oxide (NOx) smells
  22. the proposed supply sources, including the proposed ai'nount of power expected to be generated by on-site renewable energy and energy storage capacity (if applicable);
  23. documentation from the applicable electric service provider certifying that the necessary capacity is available aiid that electric service provider will service tlie Data Center; and
  24. Include detailed procedures for fire suppression, containment, ventilation and evacuation;
  25. Include detailed procedures for emergencies resulting from flood, fire, explosion and catastrophic weather events;
  26. Include an evaluation of the access roads and hydrant locations within the site to ensure suitable access for emergency equipment within the site;
  27. Ensure that all first responders receive adequate traii'iing specific to the installed system; and
  28. creation of, or improvements to, priblic park and recreation facilities;
  29. protection or preservation of natural resources (including, but not limited to, fari'nland, woodlands and waterways);
  30. independent or Township monitoring of environi'nental conditions on and around the Data Center tract at the cost and expense of the Data Center Owner or, as tlie case may be, tl'ie Owner/Operator;
  31. public infrastructure improvements or restoration thereof;
  32. mitigating impacts to the community identified in the studies required herein, or any other studies conducted in connection with the special exception application; and/or fees in lieu thereof;
  33. development of a tliermal energy network to support heating needs of nearby use; 1 1)Data Center design standards to meet or exceed the Uptime Institute Tier 4 or equivalent standards;
  34. DCE shall not be located between tlie principal building and the street of an aiterial road or a co)lector street
  35. DCE shall be separated from any adjacent residential uses by a principal building
  36. notify the Township at least three (3) montlis prior to the discontinuation or cessation of the use of a Data Center;
  37. Drinking water

Official Documents