Government Meetings

Agendas, minutes, and meeting recaps for Bergen County municipalities

Recap Available

Waldwick Mayor and Council — Aug 25, 2026

Tuesday, August 25, 2026

About this meeting

Waldwick Mayor and Council in Waldwick met on Tuesday, August 25, 2026. County Brief published an AI-labeled recap below, drawn from the official packet. Use the original documents or the official site for the full record, and browse other Waldwick Mayor and Council meetings from Waldwick.

Meeting Recap AI-generated summary

Original minutes (PDF) on waldwicknj.gov ↗Original agenda (PDF) on waldwicknj.gov ↗

County Brief is an independent local news service from Wisdom Digital Media, Inc. It is not affiliated with, endorsed by, or acting on behalf of any government agency. Meeting agendas and minutes come from each town's or school district's official website; every meeting links to the original document. Official sources

On August 25, 2026, the Waldwick Mayor and Council convened for a special meeting to address several important items on their agenda. The meeting began with a statement of compliance with the Open Public Meetings Act and a roll call of council members. A presentation by Phoenix Advisors was made regarding the Payment in Lieu of Taxes (PILOT) for the Harrison Avenue Redevelopment Project. The council approved Resolution 2026-233 for the payment of vouchers. Additionally, they introduced Ordinance No. 2026-#14, which grants a long-term tax exemption and authorizes a financial agreement with Harrison Avenue Redevelopment Urban Renewal LLC for the redevelopment project. This ordinance aims to facilitate a mixed-use development that includes residential units and retail space, contributing to the borough's affordable housing obligations and generating new municipal revenue. The public hearing for this ordinance is scheduled for September 8, 2026. The meeting concluded with a reminder of upcoming meetings.

How this recap was made

Written by AI on Oct 8, 2026 from the official minutes linked on this page, then checked by software, not by a reporter. It describes what the minutes record. This is not an official record; the linked document is. More on how County Brief works

Report an error

Get Waldwick meeting agendas and recaps by email

Free. One email when a new agenda or recap for Waldwick is posted, so you know what is being decided before and after each meeting.

Up to 3 words. You also get the free weekly Bergen County email. Unsubscribe anytime. Privacy

Items in the posted packet

Taken from the official agenda index. This is a list of attachments, not a recap of votes.

  1. The findings set forth above are hereby adopted and made part of this Ordinance
  2. Provide all of the street addresses by which the project site is currently known: 37, 39, 41, 43, 45, 47, 49 Harrison Avenue & 13 W Prospect St, Waldwick, NJ 07464
  3. Metes and Bounds Description: Please attach the metes and bounds description of the project site as Exhibit 5 of this application
  4. This project is located within an officially designated “area in need of redevelopment.” ___ X Yes ___ No
  5. This project is located within an Urban Enterprise Zone. ___ Yes ___ X No
  6. This Project is intended to provide housing to households relocated as a result of a redevelopment project: ___Yes ____No X
  7. Environmental: please describe any environmental remediation that will occur at the property. Developer: Standard tank removals and case closeouts are ongoing. #95520528.1
  8. Borough revenue: provide a projection of Borough revenue to be generated by the project through the payment of taxes, payments in lieu of taxes, water and sewer fees and any other Borough payments. Inc in PKFOD Report
  9. Customer Number: 26024
  10. Account Number: 54924
  11. Session Number: 3271791 , Session Date: 04/24/2026
  12. User ID: 222
  13. Comments On Work Request:
  14. Received Date: 04/24/2026
  15. This project consists solely of market rate housing units developed in a redevelopment area pursuant to a municipal redevelopment plan
  16. The project consists of low and moderate income housing units, which may include senior citizen low and moderate income housing units
  17. The project is new construction
  18. An existing project is being rehabilitated. If rehab, specify name of individual, entity, etc. who is the current owner of the project
  19. Borrower: Harrison Avenue Development LLC
  20. Purpose: Proceeds will fund construction financing to develop a 44 unit multifamily rental property in Waldwick, NJ
  21. Construction Loan Term: The term for the construction phase of the loan shall be up to 30 months with one 6-month auto extension at the Bank’s discretion. There will be a $3,000 extension fee for each 6-month extension
  22. Mortgage Loan Term: The mortgage loan phase shall be 120 months from Conversion based on a 360-month amortization
  23. Construction Loan Exit Fee: An Exit Fee equal to 1.00% of the loan amount will be charged if the construction loan is refinanced outside of Columbia Bank prior to conversion
  24. Interest Calculation: Actual/360-day basis
  25. Loan to Value Ratio: Maximum LTV of 70% Total Loan to Cost and no more than 70 % of the as complete/stabilized” value
  26. Expiration: This Term Sheet will expire 10 days from the date on the letter
  27. Copies of complete signed and dated Personal Financial Statements on Ion Banks form, including verification of stated liquidity
  28. Copies of the latest 3 years personal federal tax returns from each of the Guarantor, to include K-1’s reflected on Sch E of personal return
  29. The general contract, along with building plans, specifications, cost budget and schedule, along with a pro-forma income statement
  30. Recent Mortgage Statement
  31. Borrowers last 2 years of tax returns. Other Conditions:
  32. Annual submission of federal tax returns or accountant prepared financial statements for each entity (Borrower and Guarantors) within 120 days of each fiscal year end
  33. Satisfactory receipt and review of an appraisal commissioned by the Bank indicating a loan to value of not greater than 75% based on the “as-stabilized” value. The cost of said appraisal shall be borne by the Borrower
  34. Environmental screening and due diligence reasonably satisfactory to the Bank
  35. Annual submission off a certified current rent roll for subject
  36. No junior encumbrances will be allowed against the pledged collateral without the Bank’s ‘consent which consent shall not be unreasonably delayed, withheld or denied
  37. Borrower shall provide a title insurance policy in the standard form reasonably acceptable to the Bank and its counsel
  38. A certificate of zoning compliance shall be supplied to the Bank indicating that the property is in compliance with all municipal zoning
  39. A fire and hazard, or builder’s risk insurance policy naming the Bank as Mortgagee and Loss Payee on the buildings and its contents shall be in effect
  40. If the property improvements are located in a flood zone, flood insurance will be required
  41. During the loan term, the Bank or its agents shall have the right to enter the mortgaged property for the purpose of performing inspections as frequently as deemed necessary by the Bank
  42. Receipt of all permits approved by the town for the construction of the proposed property
  43. Prior to closing, the Bank will require a full ALTA survey of the subject property showing existing improvements as well as proposed improvements
  44. In the event of a default, Bank will require acceptable management contract to be assigned to the Bank
  45. The Bank will require a Bank approved consultant to provide a Plan and Cost review for the project
  46. Borrower’s and Guarantors liquidity verification to be greater than $5,000,000.00
  47. Borrower to provide current and future commercial leases
  48. DEMOLITION & SITE WORK 1 4
  49. STRUCTURAL FRAME 6 10 Steel / Concrete Frame 5 8 Exterior Sheathing & Waterproofing 8 10
  50. BUILDING ENVELOPE 10 15 Roofing System 10 12 Curtain Wall / Exterior Glazing 10 13 Exterior Cladding & Facades 10 13 Doors & Storefront 13 15
  51. MEP ROUGH-IN 12 16 Mechanical (HVAC) Rough-In 12 14 Plumbing Rough-In 12 14 Electrical Rough-In 13 15 Fire Suppression / Sprinklers 12 15 Low Voltage / Data / AV Rough-In 12 15
  52. INTERIOR CONSTRUCTION 14 18 Framing & Drywall 13 16 Insulation 13 16 Interior Doors & Frames 14 17 Ceilings 14 17 Flooring 16 18 Painting & Wall Finishes 16 18 Millwork & Casework 16 18
  53. Project Description Site located at Block 107 and Lots 1,3,5,7,8,9,10,11
  54. Term of PILOT Agreement 30 years Assumes Year 1 Full Stabilization by Year 1
  55. Property Assessment Values Projected Assessment - FMV $ 18,855,483
  56. IRR is the Internal Rate of Return a metric used in financial analysis to measure the profitability of an investment that takes into account the time value of money
  57. Developer Equity Investment

Official Documents

View on official site