Government Meetings

Agendas, minutes, and meeting recaps for Bergen County municipalities

Recap Available

Waldwick Mayor and Council — Sep 8, 2026

Tuesday, September 8, 2026

About this meeting

Waldwick Mayor and Council in Waldwick met on Tuesday, September 8, 2026. County Brief published an AI-labeled recap below, drawn from the official packet. Use the original documents or the official site for the full record, and browse other Waldwick Mayor and Council meetings from Waldwick.

Meeting Recap AI-generated summary

Original minutes (PDF) on waldwicknj.gov ↗Original agenda (PDF) on waldwicknj.gov ↗

County Brief is an independent local news service from Wisdom Digital Media, Inc. It is not affiliated with, endorsed by, or acting on behalf of any government agency. Meeting agendas and minutes come from each town's or school district's official website; every meeting links to the original document. Official sources

On September 8, 2026, the Waldwick Mayor and Council convened for a special meeting to address key redevelopment initiatives. The primary agenda item was the public hearing and adoption of Ordinance No. 2026-#14, which grants a long-term tax exemption and approves a financial agreement with Harrison Avenue Redevelopment Urban Renewal LLC for the Harrison Avenue Redevelopment Project. This project aims to transform an underutilized area into a mixed-use development, including up to 21 townhomes, a four-story building with 21 residential rental units (six of which will be affordable housing), and approximately 3,500 square feet of new retail space. The ordinance was introduced previously and was subject to public comments during the hearing. Following the public input, the council moved to pass the ordinance, which is expected to generate municipal revenue and support local businesses while fulfilling affordable housing obligations. The meeting concluded with a reminder of the next council regular meeting scheduled for September 15, 2026.

Key Decisions

  • Adoption of Ordinance No. 2026-#14
How this recap was made

Written by AI on Oct 30, 2026 from the official minutes linked on this page, then checked by software, not by a reporter. It describes what the minutes record. This is not an official record; the linked document is. More on how County Brief works

Report an error

Get Waldwick meeting agendas and recaps by email

Free. One email when a new agenda or recap for Waldwick is posted, so you know what is being decided before and after each meeting.

Up to 3 words. You also get the free weekly Bergen County email. Unsubscribe anytime. Privacy

Items in the posted packet

Taken from the official agenda index. This is a list of attachments, not a recap of votes.

  1. The findings set forth above are hereby adopted and made part of this Ordinance
  2. The financial agreement herein authorized shall be subject to all requirements of the Exemption Law and all applicable federal, State and local laws and regulations
  3. Provide all of the street addresses by which the project site is currently known: 37, 39, 41, 43, 45, 47, 49 Harrison Avenue & 13 W Prospect St, Waldwick, NJ 07464
  4. Metes and Bounds Description: Please attach the metes and bounds description of the project site as Exhibit 5 of this application
  5. This project is located within an officially designated “area in need of redevelopment.” ___ X Yes ___ No
  6. This project is located within an Urban Enterprise Zone. ___ Yes ___ X No
  7. This Project is intended to provide housing to households relocated as a result of a redevelopment project: ___Yes ____No X
  8. Environmental: please describe any environmental remediation that will occur at the property. Developer: Standard tank removals and case closeouts are ongoing. #95520528.1
  9. Borough revenue: provide a projection of Borough revenue to be generated by the project through the payment of taxes, payments in lieu of taxes, water and sewer fees and any other Borough payments. Inc in PKFOD Report
  10. Customer Number: 26024
  11. Account Number: 54924
  12. Session Number: 3271791 , Session Date: 04/24/2026
  13. User ID: 222
  14. Comments On Work Request:
  15. Received Date: 04/24/2026
  16. This project consists solely of market rate housing units developed in a redevelopment area pursuant to a municipal redevelopment plan
  17. The project consists of low and moderate income housing units, which may include senior citizen low and moderate income housing units
  18. The project is new construction
  19. An existing project is being rehabilitated. If rehab, specify name of individual, entity, etc. who is the current owner of the project
  20. Borrower: Harrison Avenue Development LLC
  21. Purpose: Proceeds will fund construction financing to develop a 44 unit multifamily rental property in Waldwick, NJ
  22. Construction Loan Term: The term for the construction phase of the loan shall be up to 30 months with one 6-month auto extension at the Bank’s discretion. There will be a $3,000 extension fee for each 6-month extension
  23. Mortgage Loan Term: The mortgage loan phase shall be 120 months from Conversion based on a 360-month amortization
  24. Construction Loan Exit Fee: An Exit Fee equal to 1.00% of the loan amount will be charged if the construction loan is refinanced outside of Columbia Bank prior to conversion
  25. Interest Calculation: Actual/360-day basis
  26. Loan to Value Ratio: Maximum LTV of 70% Total Loan to Cost and no more than 70 % of the as complete/stabilized” value
  27. Expiration: This Term Sheet will expire 10 days from the date on the letter
  28. Copies of complete signed and dated Personal Financial Statements on Ion Banks form, including verification of stated liquidity
  29. Copies of the latest 3 years personal federal tax returns from each of the Guarantor, to include K-1’s reflected on Sch E of personal return
  30. The general contract, along with building plans, specifications, cost budget and schedule, along with a pro-forma income statement
  31. Recent Mortgage Statement
  32. Borrowers last 2 years of tax returns. Other Conditions:
  33. Annual submission of federal tax returns or accountant prepared financial statements for each entity (Borrower and Guarantors) within 120 days of each fiscal year end
  34. Satisfactory receipt and review of an appraisal commissioned by the Bank indicating a loan to value of not greater than 75% based on the “as-stabilized” value. The cost of said appraisal shall be borne by the Borrower
  35. Environmental screening and due diligence reasonably satisfactory to the Bank
  36. Annual submission off a certified current rent roll for subject
  37. No junior encumbrances will be allowed against the pledged collateral without the Bank’s ‘consent which consent shall not be unreasonably delayed, withheld or denied
  38. Borrower shall provide a title insurance policy in the standard form reasonably acceptable to the Bank and its counsel
  39. A certificate of zoning compliance shall be supplied to the Bank indicating that the property is in compliance with all municipal zoning
  40. A fire and hazard, or builder’s risk insurance policy naming the Bank as Mortgagee and Loss Payee on the buildings and its contents shall be in effect
  41. If the property improvements are located in a flood zone, flood insurance will be required
  42. During the loan term, the Bank or its agents shall have the right to enter the mortgaged property for the purpose of performing inspections as frequently as deemed necessary by the Bank
  43. Receipt of all permits approved by the town for the construction of the proposed property
  44. Prior to closing, the Bank will require a full ALTA survey of the subject property showing existing improvements as well as proposed improvements
  45. In the event of a default, Bank will require acceptable management contract to be assigned to the Bank
  46. The Bank will require a Bank approved consultant to provide a Plan and Cost review for the project
  47. Borrower’s and Guarantors liquidity verification to be greater than $5,000,000.00
  48. Borrower to provide current and future commercial leases
  49. DEMOLITION & SITE WORK 1 4
  50. STRUCTURAL FRAME 6 10 Steel / Concrete Frame 5 8 Exterior Sheathing & Waterproofing 8 10
  51. BUILDING ENVELOPE 10 15 Roofing System 10 12 Curtain Wall / Exterior Glazing 10 13 Exterior Cladding & Facades 10 13 Doors & Storefront 13 15
  52. MEP ROUGH-IN 12 16 Mechanical (HVAC) Rough-In 12 14 Plumbing Rough-In 12 14 Electrical Rough-In 13 15 Fire Suppression / Sprinklers 12 15 Low Voltage / Data / AV Rough-In 12 15
  53. INTERIOR CONSTRUCTION 14 18 Framing & Drywall 13 16 Insulation 13 16 Interior Doors & Frames 14 17 Ceilings 14 17 Flooring 16 18 Painting & Wall Finishes 16 18 Millwork & Casework 16 18

Official Documents

  • Agenda — SPECIAL MEETING AGENDA 1 — View original
  • Minutes — SPECIAL MEETING MINUTES: 1 SEPTEMBER 8, 2026 — View original

View on official site