East Stroudsburg Borough Council — Oct 20, 2026
Tuesday, October 20, 2026
About this meeting
East Stroudsburg Borough Council in East Stroudsburg Borough met on Tuesday, October 20, 2026. County Brief published an AI-labeled recap below, drawn from the official packet. Use the original documents or the official site for the full record, and browse other East Stroudsburg Borough Council meetings from East Stroudsburg Borough.
Meeting Recap AI-generated summary
County Brief is an independent local news service from Wisdom Digital Media, Inc. It is not affiliated with, endorsed by, or acting on behalf of any government agency. Meeting agendas and minutes come from each town's or school district's official website; every meeting links to the original document. Official sources
The October 20, 2026, East Stroudsburg Borough Council agenda included a presentation on the Stroud Area Regional Police Department’s proposed 2027 budget and consideration of that budget. Council’s listed financial items included reviews of the draft 2027 borough budget, capital budget, trash fund, and fee schedule, along with treasurer and departmental reports. Engineering action items included a final payment application for the 2026 CDBG paving project and a proposed seven-day extension for substantial completion of the General and Water Funds paving project. The agenda also included updates on permits for the Well Nos. 3 and 4 filter upgrades and the PennDOT I-80 sewer trunk main replacement. Other listed business included possible ratification of the 2026 CDBG cooperative agreement, authorization of a sewer plant engineering review contract, and consideration of the 2025 audit. The agenda noted that a hearing on amendments to the Borough’s Floodplain Ordinance had been advertised for November 3. Upcoming meetings listed included a budget workshop on October 26 and a regular Council meeting on November 3. The supplied text did not include minutes or results for the October 20 meeting, so it does not establish whether any listed motions were made or approved.
On the agenda
- Consideration of the SARPD 2027 budget
- Review of proposed 2027 borough budget and related funds and fee schedule
- CDBG paving project final payment application
- General and Water Funds paving project change order
- CDBG FFY 2026 cooperative agreement
- Sewer plant engineering review contract
- Acceptance of the 2025 audit
- Warrant List #261020
Coming up
- Council special business meeting and budget workshop (Monday, October 26, 2026, at 7 PM)
- Community Relations Committee meeting (Monday, November 2, 2026, at 5 PM)
- Council regular meeting (Tuesday, November 3, 2026, at 7 PM)
- Operations Committee meeting (Monday, November 9, 2026, at 6 PM)
- Zoning and Planning Committee meeting (Tuesday, November 10, 2026, at 6 PM)
How this recap was made
Written by AI on Nov 19, 2026 from the official agenda linked on this page, then checked by software, not by a reporter. It comes from an agenda, so it describes what was planned, not what was decided. Boards can add or drop items at the meeting. This is not an official record; the linked document is. More on how County Brief works
Items in the posted packet
Taken from the official agenda index. This is a list of attachments, not a recap of votes.
- Call to Order at: Pledge of Allegiance led by:
- Solicitor’s Report on Executive Session: The Solicitor reported on the Executive Session that was held on October 20, 2026, beginning at , prior to the start of the Council Meeting
- Minutes of October 6, 2026, Council Regular Meeting: Motion made by , seconded by , to approve the October 6, 2026, Council Regular Meeting Minutes
- Public Comments – Agenda items:
- Acme Hose Co. No. 1 Fire September 2026 Report: distributed via email and in packet
- Stroud Area Regional Police Department (SARPD) August 2026 and September 2026 Reports: distributed via email and in packet
- Traffic Presentation: Redevelopment of 25 South Courtland Street:
- Engineer’s Action Items: distributed via email and in packet A. CDBG East Stroudsburg 2026 Paving Project (Maple Avenue and Berwick Heights Road):
- The Public Water Supply Permit Application has been resubmitted to PADEP and is under review
- The Chapter 106 Permit has been issued by PADEP
- A sewage planning exemption request has been submitted to PADEP and is under review
- The hearing on amendments to the Borough’s Floodplain Ordinance has been advertised for November 3. D. Update on PennDOT I-80 Sewer Trunk Main Replacement Project Status:
- Correspondence:
- Mayor Victor Brozusky:
- Council Members: A. Jane Gagliardo B. Paul Shemansky C. Charles Garris D. Carrie Panepinto E. Lauren Peterson F. Sonia Wolbert Page 3 of 5
- Solicitor’s Report:
- Manager’s Report: A. CDBG FFY 2026:
- Consideration to accept the 2025 Audit for the Borough of East Stroudsburg. Motion made by , seconded by , to accept the 2025 Audit for the Borough of East Stroudsburg
- Manager’s Follow-up Report:
- Information Items: A. Waste Management September 2026 Tonnage Report
- Public Comments – New Business & Non-Agenda Items:
- Ratification of Bills Payable: A. Approval of Warrant List #261020 Motion made by , seconded by , to approve the Warrant List #261020 as presented and attach to the minutes
- Include a 9.5% Trash Fund rate increase in the proposed 2027 Budget
- Funding: With UGI: Analomink, Prospect, Ransberry, Fairview, Penn, North Kistler, Marguerite, Mary, East Brown, Lackawanna, Elk, Sopher, Warren, Federal, Hallet and Teeter
- Liquid Fuels:
- CDBG: Paving Bid: Maple, Berwick Heights - COMPLETED
- Water: Orchard, Center and Brodhead Intersection and South Courtland by Washington
- PennDOT: Paved Brodhead Ave from E. Brown to I80 and Orchard from Brodhead to Prospect C. Utility work is to be done on roads to be paved
- Clean and camera storm water and sanitary sewer lines to make sure no repairs are needed
- Repair any utilities found to have an issue prior to paving. D. Levee:
- Inspection scheduled for August 4th by DEP and the Army Corp of Engineers. COMPLETED
- Repairs on the flood gate imperfections COMPLETED
- Levee Culvert #2 on Oakland Ave repairs will be made ASAP
- Levee Culvert #11 at Veterans Memorial Bridge: every avenue is being looked at to repair
- Mowing is down every three weeks, any less would cause the mower to slide and damage the Levee. E. Storm Water:
- 214 Washington Street: Demo bldg. and repair culvert pipe -
- 144 Analomink Street inlet needs to be rebuilt across the roadway
- Lincoln Ave by the Sewer Pump Station storm pipe clogs
- Chestnut Street by the Firehouse (Little Sambo grate clogs)
- Normal Street by the Koehler Field House College owned inlets
- West Broad Street to Lenox Ave across from Henry Street (Little Sambo grate clogs)
- King Street and Willow Street the inlet is too low for the water level
- 224 and 222 East Broad Street debris washes down in front of 214 and 212 issue possibly resolved after 224 paved part of their driveway where washout was occurring
- Alley next to 240 Brodhead Ave gravel washes out of the Alley into Brodhead Ave
- East Broad Street and Spring Street puddles at crosswalk
- 108 Marguerite Street low area in roadway
- 128 and 133 Berwick Heights poor drainage where new homes were built
- Sambo Creek or Johanna Boston Creek rip rap around the Sewer Main by the High School
- State Street, Spring Street and Neola Street need a Storm Sewer System
- Preventative Maintenance - Cleaning, inspecting and replacing damaged Storm Inlets. F. Water:
- Well #3 and #4 Filters - Upgrade the filtration system at the Wells for Manganese. Plans have been made and Permits are being processed
- Preventative Maintenance - Locating all curb stops and inspecting to make sure they are operable. Replacing any damages
- Leak Detection – Loggers (leak detection monitors) are spread throughout town and monitored daily
- Hydrants - Hydrants are being maintained to get them to operate more smoothly. Non-repairable are replaced - Hydrant flushing and Flow Testing
- More Security Cameras. G. Sewer:
- Sewer Main replacement or Lining – State Street, Spring Street, Neola Street, Orchard Street, South Courtland Street, Wendy’s Parking Lot, East Brown Street
- Preventative Maintenance - Locating and making sure every Manhole is accessible, cleaning and camera work on the Mains. Replacing any damages
- Many Plant repairs and updates need to be done
- Security Cameras around the Plant
- Roof was replaced. COMPLETED H. Maintenance:
- Needs a new Roof
- Needs a new Salt Shed location outside of the Aquafer Protection Zone
- Elk Street – Guardrail I. Recycling Center:
- Trailer replacement – Plans are in place for the replacement of the Office Trailer
- Autocar recycling truck keeps breaking down and having to have repairs done. J. PennDOT: I-80 Project $Engineer Costs after minus a Percentage
- Water – PennDOT
- Sanitary Sewer – PennDOT
- Storm Sewer – PennDOT
- Sanitary Sewer – Main replacement around U-Haul
- Orchard Street Water Main Replacement: COMPLETED K. U-Haul:
- Construction is under way
- Hydrant tap and installation - COMPLETED L. UGI:
- Gas mains have been replaced on many roads throughout the Borough – COMPLETED
- Working in the Chestnut Street area to upgrade the ageing system and to be able to pave Chestnut Street area next year. M. ESU:
- Demolition Part of Phase Two is underway
- Demolition has begun. P. Utility Poles:
- Emails were sent to Met-Ed, PP&L, Verizon and Blue Ridge Communications
- Emailed list included poor locations of poles, double poles and damaged/dangerous poles. Q. Traffic Lights:
- A new traffic control box for Eagle Valley Corners at Weis Market. R. Street Cleaning:
- The Street Sweeper is trying to get to Main streets every week, Minor streets with curbs every two weeks and Minor streets without curbs every three weeks. S. Leaf Collection:
- Started October 13th through December 11th. No leaf collection on the weekends or on the following Holidays; November 11, 26 and 27. T. Fencing: Total $74,000.00
- Maintenance Yard: extending the fencing to be able to secure the equipment. $22,900.00
- Water: to repair and replace fencing around Wells 3 and 4 and to extend the fencing and put a gate at the Water Treatment Plant. $39,200.00
- Wastewater: Repair fencing and replace the gate at the wastewater Treatment Plant. $9,800.00
- Twin Boroughs Recycling: repair the gate. $600.00 U. Parks:
- Benches and picnic tables have been repaired in all the parks. COMPLETED
- Walking bridge at Zacharius Park has been rebuilt to be wider and stronger. COMPLETED
- The area around the walking bridge by the Salvation Army has been repaired. COMPLETED
- The Pool is closed for the winter after a very good Summer Session. COMPLETED
- Holes and low spots in the parks were filled with dirt and seeded. COMPLETED
- Community Center needs a new Roof
- Pavilion needs a new Roof or total reconstruction
- Tennis Courts need to be resurfaced
- Parking lot needs Guardrails
- Ballfield fence repair – COMPLETED
- Pool – Leaks - waiting for quote. V. Shade Tree:
- Bare Root Tree Grant has paid to plant 22 trees so far this year and are looking to plant another 26 more trees this Fall
- The borough has plans to take down 10 dead trees on Borough properties through another Grant that will cover the cost and the Bidding. These trees are set to be cut down this fall - COMPLETED
- Roll Call:
- Public Comments:
- Executive Session: If needed
- IBW Committee: A. Monroe County Redevelopment Authority $781,000 grant B. Awaiting potential Agreement of Sale
- Levee Culvert Pipe Repairs #2 and #11: A. Strong meeting with US Army Corps and DEP. Report forthcoming
- 2027 Budget Process has commenced A. Department meetings have commenced B. YE Projections for Funds are being finalized and updated
- Accounts Receivable Collections A. Portnoff 3rd Party Collection:
- Largest Trash Bills have been approved by Council and are being submitted to Portnoff
- Top 150 Water & Sewer Receivables on August 18th Council Meeting
- Updates on the 2026 Paving Schedule:
- Bids received
- Awaiting UGI on Street Opening Permit Modification Agreement
- 2025 Audit A. Still shooting for August 31st audit completion date
- INFORMATIONAL ITEMS: A. Pending Borough Projects:
- 214 Washington Street a. Borough Manager and Owner discussing Agreement b. Stormwater culvert under the condemned building is failing
- 631 North Courtland Street – Penn Jersey Gas Station a. Professional Staff coordinating Borough protections
- I-80 Sewer Line Project – new sewer line under I-80 a. Awaiting DEP Permits b. $6.0 Million Debt Financing – October 2026 or January 2027
- IPP updates on rules and regulations requiring industrial pretreatment programs for industrial/commercial users to treat wastewater before discharging it into municipal sewer systems B. Pending Land Development Projects:
- 25 South Courtland Street – a. Conditional Use Approval b. Land Development
- Salvation Army Elevator –
- UBOX-Bond Reduction and crosswalk
- UHAUL is under construction - Elevator shaft is viewable from I-80
- Former PNC Bank – 60 Washington Street –
- Strunk Lot joinder – pending
- 112 North Courtland Street C. 2026 Pending Council Action Items:
- Stroud and Smithfield Township Sewer Authorities – for bulk sewer rate increases
- PAWSC contract – outsource fire suppression inspection services, backflow, and cross connections D. Rental Inspections and Applications for Rental License:
- 2027 Rental registration has been launched
- All willing rental properties will have been inspected within the last two years
- Recommendations to Council:
- Adjournment: Page 2 of 2 ZONING & PLANNING (ZAP) MEETING AGENDA October 13, 2026 6:00 PM
- Call to Order and Roll Call
- Public Comments
- Code Enforcement and Property Maintenance: A. Enforcement Activities and Compliance Updates: B. Continuing Property Violations and Corrective Actions: C. Solid Waste and Rental Property Enforcement:
- Parking, Traffic, and Pedestrian Safety: A. Municipal Parking Management: B. Traffic Studies and Traffic Calming: C. Pedestrian Crosswalks and Transportation Improvements: Page 1 of 2
- New Ordinance Proposals and Council Referrals: A. Visual Obstructions and Legacy Trees: B. Managed Natural Landscaping: C. Outdoor Lighting and Night Sky Protection:
- Borough Manager and Professional Staff Updates:
- Committee Recommendations and Referrals to Borough Council:
- Additional Public Comments:
- Comprehensive Ordinance: Proposed Chapter 158 addressing shielding, color temperature, mounting height, light trespass, curfews, enforcement, and municipal street lighting
- Call to Order Time & Roll Call:
- Farmer’s Market: Every other Wednesday. Last one for this season: 10/28/26
- Ribbon Cutting: Maple Avenue & Berwick Heights Road
- Pride Flag Policy: Reviewing policies from Stroudsburg and other municipalities
- The Welcome Sign at the I-80 - Exit 308: Both roundabouts are under construction
- Community Lights Update:
- Farmers Market – 2026 Season Update
- Maple Avenue and Berwick Heights Road – Ribbon Cutting
- Municipal Flag Display Policy – Discussion
- William Reese Baseball Field – Improvements and Dedication o Phase 1 project and bid status o ES Sports update
- I-80 Exit 308 – Borough Welcome Sign
- Borough Beautification and Property Maintenance Initiatives
- Community Lighting
- Community Holiday Events o Halloween Parade and Trunk or Treat o Halloween Trick-or-Treating o Christmas Caroling
- Veterans Park and Community Planters
- Borough Banners • Hometown Heroes Program • Street Banners
- Shade Tree Commission – 2026 Planting Program
- Recommendations to Borough Council
- Committee Action Items and Assignments
- Public Comment
- Adjournment BOROUGH OF EAST STROUDSBURG COMMUNITY RELATIONS COMMITTEE BOROUGH MANAGER'S SUPPLEMENTAL REPORT October 19, 2026 Background, Status Updates, Outstanding Issues and Follow-Up Assignments
- Call to Order and Roll Call • Record meeting start time and attendance
- Maple Avenue and Berwick Heights Road – Ribbon Cutting • Ribbon-cutting event associated with Maple Avenue and Berwick Heights Road. • 10:30 AM, Friday, October 23, 2026, Next to Bovino’s Parking Lot
- I-80 Exit 308 – Borough Welcome Sign • Both Exit 308 roundabouts are almost complete; flowers are planted
- Shade Tree Commission – 2026 Planting Program • The Borough's 2026 goal is to plant more than 50 trees. • Coordinate fall planting, tree locations, maintenance, and volunteer assistance
- Recommendations to Borough Council • Identify matters requiring Council authorization, funding, policy approval, or other official action. • Record each recommendation and the proposed next step
- Committee Action Items and Assignments For each outstanding matter, identify: • Responsible person or department. • Specific action required. • Target completion date. • Status to be reported at the next meeting
- Public Comment • Receive public comments in accordance with the Borough's applicable public participation procedures
- Adjournment - Record adjournment time