Government Meetings

Agendas, minutes, and meeting recaps for Monroe County municipalities

Minutes Pending

East Stroudsburg Borough Council — Nov 3, 2026

Tuesday, November 3, 2026

About this meeting

East Stroudsburg Borough Council in East Stroudsburg Borough met on Tuesday, November 3, 2026. County Brief published an AI-labeled recap below, drawn from the official packet. Use the original documents or the official site for the full record, and browse other East Stroudsburg Borough Council meetings from East Stroudsburg Borough.

Meeting Recap AI-generated summary

Original agenda (PDF) on eaststroudsburgboro.org ↗

County Brief is an independent local news service from Wisdom Digital Media, Inc. It is not affiliated with, endorsed by, or acting on behalf of any government agency. Meeting agendas and minutes come from each town's or school district's official website; every meeting links to the original document. Official sources

The posted agenda for East Stroudsburg Borough Council’s November 3, 2026 regular meeting included consideration of the 2027 Stroud Area Regional Police Department budget and a municipal contribution formula. It also listed a public hearing on Ordinance No. 1426, amending the borough’s flood-damage prevention provisions, followed by consideration of the ordinance. Financial reports and the 2027 Stroud Region Open Space and Recreation Commission budget were also on the agenda.

Engineering matters included a time-extension waiver for the 67 King Street minor subdivision, authorization for engineering work on a water-treatment-plant discharge docket renewal, and project updates on paving, water filtration permits, and the PennDOT I-80 sewer trunk main replacement. Manager’s action items included emergency sewer-line procurement on Spangenburg Avenue and two church processions, subject to stated conditions. The agenda also listed routine reports, public comments, correspondence, and approval of a warrant list. It identified upcoming committee meetings on November 9, 10, and 16, a regular Council meeting on November 17, and a special business meeting on November 23. No outcomes or votes for the November 3 agenda items were provided.

On the agenda

  • 2027 SARPD budget and municipal contribution recommendation
  • Public hearing and ordinance on flood-damage prevention
  • 2027 Stroud Region Open Space and Recreation Commission budget
  • 67 King Street minor subdivision time-extension waiver
  • Water-treatment-plant discharge docket renewal engineering work
  • Spangenburg Avenue emergency sewer-line procurement
  • Church of Saint Matthew processions
  • Warrant List #261103

Coming up

  • Operations Committee meeting (Monday, November 9, 2026, at 6 PM)
  • Zoning & Planning Committee meeting (Tuesday, November 10, 2026, at 6 PM)
  • Community Relations Committee meeting (Monday, November 16, 2026, at 5 PM)
  • Council regular meeting (Tuesday, November 17, 2026, at 7 PM)
  • Council special business meeting (Monday, November 23, 2026 at 7 PM)
How this recap was made

Written by AI on Nov 19, 2026 from the official agenda linked on this page, then checked by software, not by a reporter. It comes from an agenda, so it describes what was planned, not what was decided. Boards can add or drop items at the meeting. This is not an official record; the linked document is. More on how County Brief works

Report an error

Get East Stroudsburg Borough meeting agendas and recaps by email

Free. One email when a new agenda or recap for East Stroudsburg Borough is posted, so you know what is being decided before and after each meeting.

Up to 3 words. You also get the free weekly Monroe County email. Unsubscribe anytime. Privacy

Items in the posted packet

Taken from the official agenda index. This is a list of attachments, not a recap of votes.

  1. Call to Order at: Pledge of Allegiance led by:
  2. Solicitor’s Report on Executive Session: The Solicitor reported on the Executive Session that was held on November 3, 2026, beginning at , prior to the start of the Council Meeting
  3. Minutes of October 20, 2026, Council Regular Meeting: Motion made by , seconded by , to approve the October 20, 2026, Council Regular Meeting Minutes
  4. Minutes of October 26, 2026, Council Special Business Meeting: Motion made by , seconded by , to approve the October 26, 2026, Council Special Business Meeting Minutes
  5. Public Comments – Agenda items:
  6. Stroud Area Regional Police Department (SARPD): A. SARPD 2027 Budget:
  7. Consideration to approve the 2027 Budget for Stroud Area Regional Police Department (SARPD). Motion made by , seconded by , to approve the 2027 Budget for Stroud Area Regional Police Department (SARPD)
  8. East Stroudsburg University (ESU): DGS Presentation:
  9. Engineer’s Action Items: distributed via email and in packet A. Borough of East Stroudsburg FY 2026 CDBG Application – Update: B. 2026 General and Water Funds Paving Project – Update: C. 67 King St. Minor Subdivision:
  10. The Public Water Supply Permit Application has been submitted to PADEP and is under review. Page 3 of 5
  11. The Chapter 106 Permit has been issued by PADEP
  12. A sewage planning exemption request has been submitted to PADEP and is under review
  13. The hearing on amendments to the Borough’s Floodplain Ordinance has been advertised for November 3. F. Update on PennDOT I-80 Sewer Trunk Main Replacement Project Status:
  14. Correspondence: A. Correspondence email from Wal-Mart – Howard Mills
  15. Mayor Victor Brozusky:
  16. Council Members: A. Jane Gagliardo B. Paul Shemansky C. Carrie Panepinto D. Charles Garris E. Lauren Peterson F. Sonia Wolbert
  17. Solicitor’s Report:
  18. Manager’s Report: A. Spangenburg Avenue Sewer Line Emergency Procurement: Page 4 of 5
  19. Manager’s Follow-up Report:
  20. Informational Items:
  21. Public Comments – New Business & Non-Agenda Items:
  22. Ratification of Bills Payable: A. Approval of Warrant List #261103 Motion made by , seconded by , to approve the Warrant List #261103 as presented and attach to the minutes
  23. Borough of East Stroudsburg FY 2026 CDBG Application – Update: The Grant Application was submitted by the Redevelopment Authority of Monroe County on October 29, 2026
  24. Funding: With UGI: Analomink, Prospect, Ransberry, Fairview, Penn, North Kistler, Marguerite, Mary, East Brown, Lackawanna, Elk, Sopher, Warren, Federal, Hallet and Teeter: UNDERWAY
  25. Liquid Fuels: Was used for patching potholes
  26. CDBG: Paving Bid: Maple, Berwick Heights - COMPLETED
  27. Water: Orchard, Center and Brodhead Intersection and South Courtland by Washington: COMPLETED
  28. PennDOT: Paved Brodhead Ave from E. Brown to I80 and Orchard from Brodhead to Prospect. C. Utility work is to be done on roads to be paved
  29. Clean and camera storm water and sanitary sewer lines to make sure no repairs are needed
  30. Repair any utilities found to have an issue prior to paving. D. Levee:
  31. Inspection scheduled for August 4th by DEP and the Army Corp of Engineers. COMPLETED
  32. Repairs on the flood gate imperfections COMPLETED
  33. Levee Culvert #2 on Oakland Ave repairs will be made ASAP
  34. Levee Culvert #11 at Veterans Memorial Bridge: every avenue is being looked at to repair
  35. Mowing is down every three weeks, any less would cause the mower to slide and damage the Levee. E. Storm Water:
  36. 214 Washington Street: Demo bldg. and repair culvert pipe -
  37. 144 Analomink Street inlet needs to be rebuilt across the roadway
  38. Lincoln Ave by the Sewer Pump Station storm pipe clogs
  39. Chestnut Street by the Firehouse (Little Sambo grate clogs)
  40. Normal Street by the Koehler Field House College owned inlets
  41. West Broad Street to Lenox Ave across from Henry Street (Little Sambo grate clogs)
  42. King Street and Willow Street the inlet is too low for the water level
  43. 224 and 222 East Broad Street debris washes down in front of 214 and 212 issue possibly resolved after 224 paved part of their driveway where washout was occurring
  44. Alley next to 240 Brodhead Ave gravel washes out of the Alley into Brodhead Ave
  45. East Broad Street and Spring Street puddles at crosswalk
  46. 108 Marguerite Street low area in roadway
  47. 128 and 133 Berwick Heights poor drainage where new homes were built
  48. Sambo Creek or Johanna Boston Creek rip rap around the Sewer Main by the High School
  49. State Street, Spring Street and Neola Street need a Storm Sewer System
  50. Preventative Maintenance - Cleaning, inspecting and replacing damaged Storm Inlets. F. Water:
  51. Well #3 and #4 Filters - Upgrade the filtration system at the Wells for Manganese. Plans have been made and Permits are being processed
  52. Preventative Maintenance - Locating all curb stops and inspecting to make sure they are operable. Replacing any damages
  53. Leak Detection – Loggers (leak detection monitors) are spread throughout town and monitored daily
  54. Hydrants - Hydrants are being maintained to get them to operate more smoothly. Non-repairable are replaced - Hydrant flushing and Flow Testing
  55. More Security Cameras. G. Sewer:
  56. Sewer Main replacement or Lining – State Street, Spring Street, Neola Street, Orchard Street, South Courtland Street, Wendy’s Parking Lot, East Brown Street
  57. Preventative Maintenance - Locating and making sure every Manhole is accessible, cleaning and camera work on the Mains. Replacing any damages
  58. Many Plant repairs and updates need to be done
  59. Security Cameras around the Plant
  60. Roof was replaced. COMPLETED H. Maintenance:
  61. Needs a new Roof
  62. Needs a new Salt Shed location outside of the Aquafer Protection Zone
  63. Elk Street – Guardrail I. Recycling Center:
  64. Office Trailer replacement: COMPLETED
  65. Autocar recycling truck keeps breaking down and having to have repairs done. J. PennDOT: I-80 Project $Engineer Costs after minus a Percentage
  66. Water – PennDOT
  67. Sanitary Sewer – PennDOT
  68. Storm Sewer – PennDOT
  69. Sanitary Sewer – Main replacement around U-Haul
  70. Orchard Street Water Main Replacement: COMPLETED
  71. Circles on Prospect Street and Greentree Drive are open. K. U-Haul:
  72. Construction is under way
  73. Hydrant tap and installation - COMPLETED L. UGI:
  74. Gas mains have been replaced on many roads throughout the Borough – COMPLETED
  75. Working in the Chestnut Street area to upgrade the ageing system and to be able to pave Chestnut Street area next year. M. ESU:
  76. Demolition Part of Phase Two is underway
  77. Demolition has begun. P. Utility Poles:
  78. Emails were sent to Met-Ed, PP&L, Verizon and Blue Ridge Communications
  79. Emailed list included poor locations of poles, double poles and damaged/dangerous poles. Q. Traffic Lights:
  80. A new traffic control box for Eagle Valley Corners at Weis Market. R. Street Cleaning:
  81. The Street Sweeper is trying to get to Main streets every week, Minor streets with curbs every two weeks and Minor streets without curbs every three weeks. S. Leaf Collection:
  82. Started October 13th through December 11th. No leaf collection on the weekends or on the following Holidays; November 11, 26 and 27. T. Fencing: Total $74,000.00
  83. Maintenance Yard: extending the fencing to be able to secure the equipment. $22,900.00
  84. Water: to repair and replace fencing around Wells 3 and 4 and to extend the fencing and put a gate at the Water Treatment Plant. $39,200.00
  85. Wastewater: Repair fencing and replace the gate at the wastewater Treatment Plant. $9,800.00
  86. Twin Boroughs Recycling: repair the gate. $600.00 U. Parks:
  87. Benches and picnic tables have been repaired in all the parks. COMPLETED
  88. Walking bridge at Zacharius Park has been rebuilt to be wider and stronger. COMPLETED
  89. The area around the walking bridge by the Salvation Army has been repaired. COMPLETED
  90. The Pool is closed for the winter after a very good Summer Session. COMPLETED
  91. Holes and low spots in the parks were filled with dirt and seeded. COMPLETED
  92. Community Center needs a new Roof
  93. Pavilion needs a new Roof or total reconstruction
  94. Tennis Courts need to be resurfaced
  95. Parking lot needs Guardrails
  96. Ballfield fence repair – COMPLETED
  97. Pool – Leaks - waiting for quote. V. Shade Tree:
  98. Between the Bare Root Tree Grants and Beautification Day, the Shade Tree Commission has planted 30 trees so far this year and are looking to plant another 20 more trees this Fall
  99. The borough has plans to take down 10 dead trees on Borough properties through another Grant that will cover the cost and the Bidding. These trees are set to be cut down this fall - COMPLETED
  100. Roll Call:
  101. Public Comments:
  102. Executive Session: If needed
  103. IBW Committee: A. Monroe County Redevelopment Authority $781,000 grant B. Awaiting potential Agreement of Sale
  104. Levee Culvert Pipe Repairs #2 and #11: A. Strong meeting with US Army Corps and DEP. Report forthcoming
  105. 2027 Budget Process has commenced A. Department meetings have commenced B. YE Projections for Funds are being finalized and updated
  106. Accounts Receivable Collections A. Portnoff 3rd Party Collection:
  107. Largest Trash Bills have been approved by Council and are being submitted to Portnoff
  108. Top 150 Water & Sewer Receivables on August 18th Council Meeting
  109. Updates on the 2026 Paving Schedule:
  110. Bids received
  111. Awaiting UGI on Street Opening Permit Modification Agreement
  112. 2025 Audit A. Still shooting for August 31st audit completion date
  113. INFORMATIONAL ITEMS: A. Pending Borough Projects:
  114. 214 Washington Street a. Borough Manager and Owner discussing Agreement b. Stormwater culvert under the condemned building is failing
  115. 631 North Courtland Street – Penn Jersey Gas Station a. Professional Staff coordinating Borough protections
  116. I-80 Sewer Line Project – new sewer line under I-80 a. Awaiting DEP Permits b. $6.0 Million Debt Financing – October 2026 or January 2027
  117. IPP updates on rules and regulations requiring industrial pretreatment programs for industrial/commercial users to treat wastewater before discharging it into municipal sewer systems B. Pending Land Development Projects:
  118. 25 South Courtland Street – a. Conditional Use Approval b. Land Development
  119. Salvation Army Elevator –
  120. UBOX-Bond Reduction and crosswalk
  121. UHAUL is under construction - Elevator shaft is viewable from I-80
  122. Former PNC Bank – 60 Washington Street –
  123. Strunk Lot joinder – pending
  124. 112 North Courtland Street C. 2026 Pending Council Action Items:
  125. Stroud and Smithfield Township Sewer Authorities – for bulk sewer rate increases
  126. PAWSC contract – outsource fire suppression inspection services, backflow, and cross connections D. Rental Inspections and Applications for Rental License:
  127. 2027 Rental registration has been launched
  128. All willing rental properties will have been inspected within the last two years
  129. Recommendations to Council:
  130. Adjournment: Page 2 of 2 ZONING & PLANNING (ZAP) MEETING AGENDA October 13, 2026 6:00 PM
  131. Call to Order and Roll Call
  132. Public Comments
  133. Code Enforcement and Property Maintenance: A. Enforcement Activities and Compliance Updates: B. Continuing Property Violations and Corrective Actions: C. Solid Waste and Rental Property Enforcement:
  134. Parking, Traffic, and Pedestrian Safety: A. Municipal Parking Management: B. Traffic Studies and Traffic Calming: C. Pedestrian Crosswalks and Transportation Improvements: Page 1 of 2
  135. New Ordinance Proposals and Council Referrals: A. Visual Obstructions and Legacy Trees: B. Managed Natural Landscaping: C. Outdoor Lighting and Night Sky Protection:
  136. Borough Manager and Professional Staff Updates:
  137. Committee Recommendations and Referrals to Borough Council:
  138. Additional Public Comments:
  139. Comprehensive Ordinance: Proposed Chapter 158 addressing shielding, color temperature, mounting height, light trespass, curfews, enforcement, and municipal street lighting
  140. Farmers Market – 2026 Season Update
  141. Maple Avenue and Berwick Heights Road – Ribbon Cutting
  142. Municipal Flag Display Policy – Discussion
  143. William Reese Baseball Field – Improvements and Dedication o Phase 1 project and bid status o ES Sports update
  144. I-80 Exit 308 – Borough Welcome Sign
  145. Borough Beautification and Property Maintenance Initiatives
  146. Community Lighting
  147. Community Holiday Events o Halloween Parade and Trunk or Treat o Halloween Trick-or-Treating o Christmas Caroling
  148. Veterans Park and Community Planters
  149. Borough Banners o Hometown Heroes Program o Street Banners
  150. Shade Tree Commission – 2026 Planting Program
  151. Recommendations to Borough Council
  152. Committee Action Items and Assignments
  153. Public Comment
  154. Adjournment BOROUGH OF EAST STROUDSBURG COMMUNITY RELATIONS COMMITTEE BOROUGH MANAGER'S SUPPLEMENTAL REPORT November 2, 2026 Background, Status Updates, Outstanding Issues and Follow-Up Assignments
  155. Call to Order and Roll Call • Record meeting start time and attendance
  156. Farmers Market – 2026 Season Update • A good 2026 season – In early 2027, review, plan, market, expand
  157. Paving and Infrastructure Ribbon Cuttings • October 23rd Ribbon-cutting event: Maple Avenue and Berwick Heights Road. • Kelly to schedule more ribbon cuttings between November 4 and December 1st
  158. I-80 Exit 308 – Borough Welcome Sign • Both Exit 308 roundabouts are almost complete; flowers are planted
  159. Shade Tree Commission – 2026 Planting Program • The Borough's 2026 goal is to plant more than 50 trees. • Coordinate fall planting, tree locations, maintenance, and volunteer assistance
  160. Recommendations to Borough Council • Identify matters requiring Council authorization, funding, policy approval, or other official action. • Record each recommendation and the proposed next step
  161. Committee Action Items and Assignments For each outstanding matter, identify: • Responsible person or department. • Specific action required. • Target completion date. • Status to be reported at the next meeting
  162. Public Comment • Receive public comments in accordance with the Borough's applicable public participation procedures

Official Documents

View on official site